CDBG Stormwater & Roadway Improvements Project

Project Owner: 
City of Hermitage
800 North Hermitage Road
Hermitage, PA 16148
724.981.0800

Project Highlights:

  • Funding source – Community Development Block Grant.
  • Full-service project (planning through construction contract closeout).

FY2020 CDBG Roadway Improvements Project
FY2021 CDBG Stormwater & Roadway Improvements Project
FY2022 CDBG Stormwater & Roadway Improvements Project
FY2023 CDBG Stormwater & Roadway Improvements Project

The projects are funded with Community Development Block Grant (CDBG) funds from the City of Hermitage entitlement on an annual basis.  The project location and scope varies from year to year, but the betterment projects generally consist of storm sewer improvements, and milling and paving of roadways in mature residential neighborhoods.  Other minor improvements occur as necessary, such as adjustments to manholes and valve boxes, adjustment of driveway aprons, and backing up edges of pavement with millings or topsoil.  IAG provides Design Phase Services for the projects, distributes plans and specifications on behalf of the owner during the Bid Phase Services, and provides Construction Administration Services through the closeout of the construction contracts. 

Similar Posts